The Roads team is addressing the needs of seven rural roads over the next three weeks, with a new patch repair program. Staff have rented the DuraPatcher, which allows the team to effectively repair potholes on surface treated and asphalt roads, without the need to do a cold-mix. This solution is more cost-effective and the patch is expected to last over three years.

The work is scheduled to be completed the week of August 31st.

List of Patch Work:

24 Sideroad (Concessions 5 and 7)

10th Line (Lot 13 and 15)

9th Line (Lot 9)

9th Line (approach at Town Line)

Erin Halton Hills Boundary Line (Concessions 1 – 3)

Town Line (Concessions 4-7)

1st Line (Lot 1-5)

2nd Line and 27 Sideroad

2nd Line (Lot 25-27)

 